10 events,Steam to be shutdown April 9 at 7 am for estimated 3 months. |
9 events,
-
Check gloves/ear plugs/mask levels at TA station and paint room every week. Refill as necessary |
11 events, |
9 events,
-
FYI - there was an email update that bi-weekly at 10am they will be "restarting SAT system. This action will result in some odd door behavior for up to 45 minutes, including doors not locking or unlocking at their scheduled times, and some unlocked doors suddenly locking. " |
|||
8 events,
-
Check gloves/ear plugs/mask levels at TA station and paint room every week. Refill as necessary |
8 events,
-
From Sean at Storr:Hi AllBased on the 6/2 furniture arrival date & manpower availability, we can schedule delivery / installation Thursday 6/5 beginning @ approx. 8:30am. I anticipate the work will take about (8) hours to complete assuming the area where the furniture goes is clear prior to arrival. Please let me know if the… |
|||||
8 events,
-
Check gloves/ear plugs/mask levels at TA station and paint room every week. Refill as necessary |
8 events,
-
FYI - there was an email update that bi-weekly at 10am they will be "restarting SAT system. This action will result in some odd door behavior for up to 45 minutes, including doors not locking or unlocking at their scheduled times, and some unlocked doors suddenly locking. " |
|||||
11 events, |
10 events,
-
Check gloves/ear plugs/mask levels at TA station and paint room every week. Refill as necessary |
12 events,
-
RC, Our security supervisor needs to disconnect a 2nd level camera near the elevator that requires him to access the junction box on the 1st level near the breezeway elevator camera for approximately 30 minutes. Can we get your approval to access the 1st floor level worksite in the morning around 9AM? Thank you, Yves Cyr… |
||||
10 events,
-
https://lomaxconstruction-my.sharepoint.com/:x:/p/rmccabe/EbUVnfoMRCtAqEracYIvbjwBxifURJdZNw9HbdZy0i3P-w |
8 events,
-
Check gloves/ear plugs/mask levels at TA station and paint room every week. Refill as necessary |
8 events,
-
FYI - there was an email update that bi-weekly at 10am they will be "restarting SAT system. This action will result in some odd door behavior for up to 45 minutes, including doors not locking or unlocking at their scheduled times, and some unlocked doors suddenly locking. " |
||||
9 events,
-
Check gloves/ear plugs/mask levels at TA station and paint room every week. Refill as necessary |
10 events,
-
Good Afternoon, There will be a Hot Water, Heating, and Steam Disconnect on 07/02/2025, beginning at 6:00 AM and ending at 2:00 PM, for the following buildings: SAS Hall Park Shops Page Hall Poe Hall 1911 Building 111 Lampe Burlington Laboratory Withers Hall Patterson Hall Ricks Hall Ricks Addition Winston Hall Caldwell Hall Tompkins Hall … |